FossumMichael Edward |
USA |
International order nº: 450 |
US astr. nº: 284 |
|
|
| Ord. num. |
Startup spacecraft |
Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | STS-121 (Discovery/32) |
18h.37m.55s. Jul 04, 2006 |
MS | STS-121 (Discovery/32) |
13h.15m.49s. Jul 17, 2006 |
12d.18h.37m.54s. |
| 2 | STS-124 (Discovery/35) |
31 May 2008 21h 01m |
MSP 3 | STS-124 (Discovery/35) |
14 Jun 2008 15h 15m |
13d 18h 13m |
| 3 | Soyuz TMA-02M | 07 Jun 2011 20h 12m |
FE/PE-/ISS-28/29 | Soyuz TMA-02M | 22 Nov 2011 02h 25m |
167d 06h 13m |
| Total duration: | 193d 19h 03m 54s | |||||
| Date of beginning |
Time (UT) of beginning |
Duration | Explanation |
| 08 Jul 2006 | 13:17 | 7h 31m | P. Sellers and Fossum; mission "STS-121". The 19th EVA from airlock Quest. Maintenance on the station′s mobile transporter and a test of astronaut movement on the end of the robotic arm boom extension for possible heat shield repairs during future flights |
| 10 Jul 2006 | 12:14 | 6h 47m | P. Sellers and Fossum; mission "STS-121". The 20th EVA from airlock Quest. Installation of a spare thermal control system pump on to the outside of the Quest Airlock; replacement of reel assembly for a cable that provides power and data to the station′s mobile transporter |
| 12 Jul 2006 | 11:20 | 7h 11m | P. Sellers and Fossum; mission "STS-121". The 21st EVA from airlock Quest. Demonstration of on-orbit heat shield repair techniques |
| 03 Jun 2008 | UT | 06h 48m | R. Garan and Fossum; mission ISS-Exp. Transfer of the Orbiter Boom Sensor System back to the shuttle from its temporary location of the station′s truss, or backbone. The crew then prepared the JEM PM for its removal from the shuttle′s payload bay. |
| 05 Jun 2008 | UT | 07h 11m | R. Garan and Fossum; mission ISS-Exp. Installing covers and external television equipment on the JEM PM and remove covers on the JEM RMS. They also prepared for the relocation of the Japanese logistics module. |
| 08 Jun 2008 | UT | 06h 33m | R. Garan and Fossum; mission ISS-Exp. Replacing a failed nitrogen tank assembly on the station′s truss with a spare that was temporarily stored on one of the station external stowage platforms. They also retrieved a failed camera system on the truss. |
| 12 Jul 2011 | UT | 06h 31m | R. Garan and Fossum; mission ISS-Exp. Transfer of a failed ammonia pump to the shuttle cargo bay, transfer of the Robotic Refueling Mission (RRM) to the station and place an experiment on ELC-2 for long duration exposure. |
| Total: | 48h 32m | EVAs: 7 | |
Backup assignments:
|
Personal patch:
|
| Ref.: #7, #16 - update: 23.11.2025 | Home |