LoveStanley Glen |
USA |
International order n°: 469 |
US astr. n°: 299 |
|
|
| Ord. num. |
Startup spacecraft |
Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | STS-122 (Atlantis/29) |
07 Feb 2008 19h 45m 30s |
MS | STS-122 (Atlantis/29) |
20 Feb 2008 14h 08m 08s |
12d.18h.22m.38s |
| Total duration: | 12d 18h 22m 38s | |||||
| Date of beginning |
Time (UT)
of beginning |
Duration | Explanation |
| 11 Feb 2008 | 14:13 | 7h 58m | R.Walheim and Love; mission "STS-122". The 51st EVA from airlock Quest. Preparing the Columbus module for installation on Harmony. They installed the Power Data Grapple Fixture on Columbus. Preparing work to remove the Nitrogen Tank Assembly, a part of the station′s thermal control system, from the P1 truss. |
| 15 Feb 2008 | 13:07 | 7h 25m | R.Walheim and Love; mission "STS-122" . The 53rd EVA from airlock Quest. Installing two payloads on Columbus′ exterior: SOLAR. Moving a failed control moment gyroscope from its storage location on the station to the shuttle′s payload bay for return to Earth. |
| Total: | 15h 23m | EVAs: 2 | |