Love

Stanley Glen

USA


International order n°: 469

US astr. n°: 299


Personal data:

Birthdate:  08 Jun 1965
Birthplace:  San Diego / California
Marital status:  married
Children:  two
Selection date:  04 Jun 1998
Selection group:  NASA-17
Job:  MSP
Status:  Ret. Nov 2011

Spaceflights:

Ord.
num.
Startup
spacecraft
Date and time
of launch (UT)
Status while
launch
Spacecraft
of landing
Date and time
of landing (UT)
Duration
1 STS-122
(Atlantis/29)
07 Feb 2008
19h 45m 30s
MS STS-122
(Atlantis/29)
20 Feb 2008
14h 08m 08s
12d.18h.22m.38s
Total duration: 12d 18h 22m 38s

EVA′s:

Date of
beginning
Time (UT) of
beginning
Duration Explanation
11 Feb 2008 14:13 7h 58m R.Walheim and Love; mission "STS-122". The 51st EVA from airlock Quest.
Preparing the Columbus module for installation on Harmony. They installed the Power Data Grapple Fixture on Columbus. Preparing work to remove the Nitrogen Tank Assembly, a part of the station′s thermal control system, from the P1 truss.
15 Feb 2008 13:07 7h 25m R.Walheim and Love; mission "STS-122" . The 53rd EVA from airlock Quest.
Installing two payloads on Columbus′ exterior: SOLAR. Moving a failed control moment gyroscope from its storage location on the station to the shuttle′s payload bay for return to Earth.
Total: 15h 23m EVAs: 2

Additional information


Ref: #16, #21 - update: 08.05.18