ParazynskiScott Edward |
USA |
International order n°: 321 |
US astr. n°: 204 |
|
|
| N° | Startup spacecraft |
Date and time launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time
landing (UT) |
Duration |
| 1 | STS-66 (Atlantis/13) |
16h.59m.43s. Nov 03, 1994 |
MS | STS-66 (Atlantis/13) |
15h.34m.35s. Nov 14, 1994 |
10d.22h.34m.52s. |
| 2 | STS-86 (Atlantis/20) |
02h.34m.19s. Sep 26, 1997 |
MS/FE VE-21/MIR |
STS-86 (Atlantis/20) |
21h.56m.31s. Oct 06, 1997 |
10d.19h.22m.12s. |
| 3 | STS-95 (Discovery/25) |
19h.19m.34s. Oct 29, 1998 |
MS 2 | STS-95 (Discovery/25) |
17h.04m.29s. Nov 07, 1998 |
8d.21h.44m.55s. |
| 4 | STS-100 (Endeavour/16) |
18h.40m.42s. Apr 19, 2001 |
MS | STS-100 (Endeavour/16) |
16h.11m.56s. May 01, 2001 |
11d.21h.31m.14s. |
| 5 | STS-120 (Discovery/34) |
15h.38m.19s. Oct 23, 2007 |
MS | STS-120 (Discovery/34) |
18h.02m.13s. Nov 07, 2007 |
15d.02h.23m.54s. |
| Total duration: | 57d 15h 37m 07s | |||||
| Date of beginning |
Time (UT)of beginning |
Duration | Explanation |
| 01 Oct 1997 | 17:29 | 5h 01m | Parazynski and V.Titov; mission "STS-86" - Recovery of experiments from DM (EDFT-06) |
| 22 Apr 2001 | 11:45 | 7h 10m | C.Hadfield and Parazynski; mission "STS-100" - Installing the Canadian built robotic arm (57.7 foot long) called: Canadarm2 |
| 24 Apr 2001 | 12:34 | 7h 40m | C.Hadfield and Parazynski; mission "STS-100" - Connecting the Power and Data Grapple Fixture circuits for the robotic arm |
| 26 Oct 2007 | 10:02 | 6h 14m | Parazynski and D.Wheelock; mission "STS-120". The 42nd EVA from airlock Quest. Retrieve and stow S-band Antenna Support Assembly, detach Node 2 ("Harmony") heater cables and remove cover from Node 2 aft berthing mechanism, stow grapple fixture on Node 2, disconnect Z1/P6 truss fluid lines, install shrouds on P6 radiator and Sequential Shunt Unit, move and attach Node 2 to Node 1 left-hand docking port with Station robotic arm, pressurise area between Node 1 and Node 2 hatches, perform leak check, open Node 1 hatch |
| 28 Oct 2007 | 09:32 | 6h 33m | Parazynski and D.Tani; mission "STS-120". The 43rd EVA from airlock Quest. Disconnect Z1 to P6 truss cables and unbolt P6; outfit outside Node 2 with handrails, worksite interface fixtures, gap spanners and install thermal covers, remote Node 2 berthing mechanism restraints; install grapple fixture on Node 2; configure squib firing unit on S1 truss for deploying radiators. |
| 30 Oct 2007 | 09:45 | 7h 08m | Parazynski and D.Wheelock; mission "STS-120". The 44th EVA from airlock Quest. The astronauts bolt P6 truss to P5 truss, attached P5 to P6 cabling, removed P6 radiator restraint and cover on Sequential Shunt unit and deploy radiator, configured squib firing unit on P1 truss, relocated main Bus Switching Unit from the Shuttle Cargo Bay to External Stowage Platform 2. |
| 03 Nov 2007 | 10:03 | 7h 19m | Parazynski and D.Wheelock; mission "STS-120". The 45th EVA from airlock Quest. Attaching cufflink-like clips across the 15-foot width of the torn P6-4B solar array blanket to provide the strength needed to permit its full extension. This dramatic repair job was carried out successful. |
| Total: | 47h 05m | EVAs: 7 | |