Redstone CC-1013 |
US-Army |
![]() Warhead of missile CC-1013 being lowered onto dolly outside Missile Assembly Building #15 on Oct 16, 1958 |
![]() Gantry crane at White Sands opening up to back away from Redstone Block 1 missile #1013 on Dec 18, 1958 |
![]() Missile #1013 with gantry crane at White Sands on Dec 18, 1958 |
![]() Dec 18, 1958 |
![]() Preparing to fuel Redstone Block 1 tactical missile #1013 on Dec 18, 1958 |
![]() Preparing to fuel, Dec 18, 1958 |
![]() H-frame rigged with service platform and elevator carrying a man up to the instrument compartment and external drop tank of Redstone Block 1 on April 6, 1959 |
| Ref.: #57 - update: 16.08.15 | Home |