HagueTyler Nicholas |
USA |
International order nº: 565 |
US astr. nº: 350 |
|
|
| No | Launch Spacecraft | Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | Soyuz MS-10 | 11 Oct 2018 08:40:15 UT |
Planned Exp.57 / 58 | Soyuz MS-10 | 11 Oct 2018 08:59:56 UTC |
19m 41s |
| 2 | Soyuz MS-12 | 14 Mar 2019 19:14:08 UTC |
Planned Exp.59 / 60 | Soyuz MS-12 | 03 Oct 2019 10:59:21 UTC |
202d 15h 45m |
| 3 | SpaceX Crew-9 | 29.08.2024 17:17:21 |
CDR / Flight Engineer - ISS Exp.72 | SpaceX Crew-9 | 18.03.2025 21:57:07 |
171d 04h 39m |
| Total duration: | 373d 20h 23m | |||||
| Date | Time (UTC) of starting |
Duration | Crew & Remarks |
| 22 Mar 2019 | 6h 39m | Hague and A.McClain; mission ISS Both ventured outside the Quest airlock to install the adapter plates for the new batteries and to replace nickel-hydrogen batteries with newer, more powerful lithium-ion batteries for the power channel on one pair of the station′s solar arrays, completing the upgrades to two station power channels, completing the upgrades to two station power channels. | |
| 29 Mar 2019 | 6h 45m | Hague and C.Koch; mission ISS The two astronauts successfully connected three newer, more powerful lithium-ion batteries to replace the previous six nickel-hydrogen batteries that provide power for one channel on one pair of the station′s solar arrays. | |
| 21 Aug 2019 | 6h 32m | Hague and A.Morgan; mission ISS The duo assisted in the installation of International Docking Adapter-3 (IDA-3) to Pressurized Mating Adapter-3 on the space-facing side of the station′s Harmony module. | |
| 16 Jan 2025 | 6h 00m | Hague and S.Williams; mission ISS They replaced a rate gyro assembly, a planar reflector on IDA-3 and did fit checks ahead of the AMS-2 upgrades. | |
| Total: | 25h 56m | EVAs: 4 | |
| No. | Mission | Job | Date |
| 1 | Soyuz MS-08 | FE | 21 Mar 2018 |
| Ref.: #7(JR755), #16 - update: 13.12.2025 | Home |