Robinson

Stephen Kern

USA


International order n°: 365

US astr. n°: 231


Personal data:

Birthdate:  26 Oct 1955
Birthplace:  Sacramento / California
Marital status:  single
Children:  -
Grade / Fonction:  Ph.D, NASA
Selection date  09 Dec 1994
Selection group  NASA-15
Job:  MSP
Status:  Ret. 30 Jun 2012

Spaceflights:

Launch
spacecraft
Date and time
launch (UT)
Status
while
launch
Landing
Spacecraft
Date and time
landing (UT)
Duration
1 STS-85
(Discovery/23)
14h.41m.00s.
Aug 07, 1997
MS STS-85
(Discovery/23)
11h.09m.07s.
Aug 19, 1997
11d.20h.28m.07s.
2 STS-95
(Discovery/25)
19h.19m.34s.
Oct 29, 1998
MS 1 STS-95
(Discovery/25)
17h.04m.29s.
Nov 07, 1998
8d.21h.44m.55s.
3 STS-114
(Discovery/31)
14h.39m.00s.
Jul 26, 2005
MS/FE STS-114
(Discovery/31)
12h.12m.36s.
Aug 09, 2005
13d.21h.33m.36s.
4 STS-130
(Endeavour/24)
08 Feb 2010
09h.14m.
MSP STS-130
(Endeavour/24)
22 Feb 2010
03h.20m.
13d.18h.06m.
Total duration: 48d 09h 52m 38s


EVA′s:

Date of
beginning
Time of
beginning
Duration Crew & Remarks
30 Jul 2005 09:46 UT 6h 50m Robinson and S.Noguchi; mission "STS-114"
Testing thermal protection system repair techniques and installation of the External Stowage Platform-2 Attachment Device (ESPAD) on the space station
01 Aug 2005 08:42 UT 7h 14m Robinson and S.Noguchi; mission "STS-114"
Replace of a failed International Space Station attitude control gyroscope
03 Aug 2005 08:48 UT 6h 01m Robinson and S.Noguchi; mission "STS-114"
Attach of a massive external tool box to the space station′s Quest airlock module; mounting an experiment package on the top of the station′s solar array truss; and remove two "gap fillers" sticking up between heat shield tiles on Discovery′s belly.
Total: 20h 05m EVAs: 3

Backup assignments

No. Mission Job Date
1  STS-108  Flight Engineer  

Additional information:


Ref: #16, #21 - update: 13.05.18