RobinsonStephen Kern |
USA |
International order n°: 365 |
US astr. n°: 231 |
|
|
| N° | Launch spacecraft |
Date and time launch (UT) |
Status while launch |
Landing Spacecraft |
Date and time
landing (UT) |
Duration |
| 1 | STS-85 (Discovery/23) |
14h.41m.00s. Aug 07, 1997 |
MS | STS-85 (Discovery/23) |
11h.09m.07s. Aug 19, 1997 |
11d.20h.28m.07s. |
| 2 | STS-95 (Discovery/25) |
19h.19m.34s. Oct 29, 1998 |
MS 1 | STS-95 (Discovery/25) |
17h.04m.29s. Nov 07, 1998 |
8d.21h.44m.55s. |
| 3 | STS-114 (Discovery/31) |
14h.39m.00s. Jul 26, 2005 |
MS/FE | STS-114 (Discovery/31) |
12h.12m.36s. Aug 09, 2005 |
13d.21h.33m.36s. |
| 4 | STS-130 (Endeavour/24) |
08 Feb 2010 09h.14m. |
MSP | STS-130 (Endeavour/24) |
22 Feb 2010 03h.20m. |
13d.18h.06m. |
| Total duration: | 48d 09h 52m 38s | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 30 Jul 2005 | 09:46 UT | 6h 50m | Robinson and S.Noguchi; mission "STS-114" Testing thermal protection system repair techniques and installation of the External Stowage Platform-2 Attachment Device (ESPAD) on the space station |
| 01 Aug 2005 | 08:42 UT | 7h 14m | Robinson and S.Noguchi; mission "STS-114" Replace of a failed International Space Station attitude control gyroscope |
| 03 Aug 2005 | 08:48 UT | 6h 01m | Robinson and S.Noguchi; mission "STS-114" Attach of a massive external tool box to the space station′s Quest airlock module; mounting an experiment package on the top of the station′s solar array truss; and remove two "gap fillers" sticking up between heat shield tiles on Discovery′s belly. |
| Total: | 20h 05m | EVAs: 3 | |
| No. | Mission | Job | Date |
| 1 | STS-108 | Flight Engineer |